Crane jobs in Moscow and Moscow Region
a) Reconstruction of Tverkaya Zastava Square (at Belorussky Vokzal)
- As part of the reconstruction, our company performed dismantling of a LOVAT tunnel shield (diameter of the tunnel shield - 4,13m; maximum section weight - 56t).
- The job was carried out in difficult conditions during heavy traffic at the square, near the entrance to Belorusskaya Metro Station.
b) Erection of a boiler house chimney at Poselok Sverdlovsky, Moscow Region
- The chimney (2,1m in diameter) was erected in sections. The length of each section - 10,5m.
- The erection of the last section was done at the height of 42 m by a LIEBHERR LTM1100-4.1.crane.
c) Transportation and erection of a LOVAT tunnel shield (Shirokaya ST., Moscow).
Europe-Lloyd Special Transport performed transportation and erection of a LOVAT tunnel shield for the construction of an underground cable collector at Shirokaya St., as part of the Moscow energy system development program.
- Tunnel shield diameter - 3,3m; weight of the sections - 54 и 49t.
- The erection was carried out by a LIEBHERR LTM 1160-5.1 crane
|